Debug: Database connection successful
You are not logged in.
Offline
Like button can go here
Place Holder for today's Calendar update:
For those who are members, the Business Calendar for Mars project is documented in the Engineering Category.
The system has been installed on a new Linux system with success, and yesterday it was installed on a Windows 11 system with success.
python3 PythonCalendar/BusinessCalendarForMarsV08.py
Prediction Generated (Earth UTC): 2026-11-27 13:00:24 UTC
Sol 56 began at 18:56:15 UTC on November 26, 2026
Earth Date November 26 spans Sols 55 and 56
--- Sol 56 of 668 ---
Mars Date: MY39 / Month 2 / Day 28
Constellation: West Gemini
Sol Classification: Saturday
Airy-0 Sol Start (Earth UTC): 2026-11-26 18:56:15 UTC
Airy-0 Sol End (Earth UTC): 2026-11-27 19:35:50 UTC
Sol Duration (Mars Time): 24h 00m 00s
Sol Duration (Earth Time): 24h 39m 35.244s
Earth UTC Overlap: 20.5% (2026-11-26) / 79.5% (2026-11-27)
Martian Year:
39
Martian Astronomical Month:
1
Solar longitude Ls:
27.5
Sol number:
56 << same as Business Calendar for Mars
(th)
Offline
Like button can go here
Offline
Like button can go here
Place holder for today's Calendar update
python3 BusinessCalendarForMarsV08.py
Prediction Generated (Earth UTC): 2026-11-28 13:00:43 UTC
Sol 57 began at 19:35:50 UTC on November 27, 2026
Earth Date November 27 spans Sols 56 and 57
--- Sol 57 of 668 ---
Mars Date: MY39 / Month 3 / Day 1
Constellation: East Gemini
Sol Classification: Sunday
Airy-0 Sol Start (Earth UTC): 2026-11-27 19:35:50 UTC
Airy-0 Sol End (Earth UTC): 2026-11-28 20:15:25 UTC
Sol Duration (Mars Time): 24h 00m 00s
Sol Duration (Earth Time): 24h 39m 35.244s
Earth UTC Overlap: 17.9% (2026-11-27) / 82.1% (2026-11-28)
Martian Year:
39
Martian Astronomical Month:
1
Solar longitude Ls:
27.9
Sol number:
57
Offline
Like button can go here
Offline
Like button can go here