We are going to be waiting for a bit for a possible launch
NASA hopes to launch Artemis I near the end of the month, on September 23 or 27.
Hopefully it's going to look like this
Of course, there are those that think that NASA and America’s space program are becoming a running joke as its simply a poorly cobbled-together poster child for a once great space program
Our nation cannot afford apologists for NASA, any incompetent or greedy contractors who may supply the agency, nor the clueless politicians who enable failure and the disgraceful waste of American taxpayers’ hard-earned money.
All of the contractors have been passing the startup cost back to Nasa such that this first ride is estimated to cost $4.1 billion
Offline
Like button can go here
So, they're not taking SLS back to the high bay to properly fix it?
On top of that, they want to fly without sufficient electrical power for the self-destruct mechanism?
Where is this "good idea fairy"?
We need an oversized flyswatter to kill it before it kills one of us.
Offline
Like button can go here
Following up on post #27 by kbd512, and others who have commented upon the inability to recharge the self-destruct mechanism ...
Yesterday's Zoom meeting of the North Houston NSS chapter included lengthy discussion of Artemis I. A chat is included in the Zoom service, and a former NASA employee wrote a chat message indicating that the batteries were accessible and rechargeable in the Shuttle system. He said that the designers of Artemis decided NOT to include that feature in their design.
(th)
Offline
Like button can go here
What you are watching play out here, is essentially the proof of my contentions in posts 4 and 10 of this thread. Ugly, ain't it?
GW
GW Johnson
McGregor, Texas
"There is nothing as expensive as a dead crew, especially one dead from a bad management decision"
Offline
Like button can go here
space dot com
NASA engineers replaced leaky seals on two fuel lines of the Artemis 1 moon rocket over the weekend, setting the stage for a fueling test to see if the repairs worked. The repair work is aimed at plugging a hydrogen fuel leak in an 8-inch line leading into the core stage of the 32-story SLS rocket. While replacing that seal, engineers also replaced the seal on a smaller 4-inch hydrogen "bleed line" that also saw a leak in a scrubbed Aug. 29 launch try. With the repair work complete, NASA is now preparing for a fueling test to check if the SLS rocket's hydrogen leaks are indeed fixed. That test could occur as early as Saturday, Sept. 17, and will fill the 322-foot-tall (98 meters) rocket with the 736,000 gallons of liquid hydrogen and liquid oxygen it needs for launch, NASA has said.
Well at least its a proper test.
That test is designed to chill the engines down to a temperature of minus 420 degrees Fahrenheit (minus 251 degrees Celsius) to prepare them for their super-chilled propellant.
Offline
Like button can go here
They are counting on getting approval to fly with batteries factor 2+ past their rated "cannot fail" life. They may still be good, and they may not be, nobody can know, because the designers of this abortion thought there would never, ever be any need to have access to those batteries, anywhere but in the assembly building. Nobody bothered to ask old-timers like me, obviously. Any of us oldsters could have told them that design choice was asinine-stupid, long before any metal was ever cut.
GW
GW Johnson
McGregor, Texas
"There is nothing as expensive as a dead crew, especially one dead from a bad management decision"
Offline
Like button can go here
It would appear that the hydrogen continues to leak, despite the seal repairs (apparently there were 2). They still lack the waiver to launch with untested termination system batteries, now more than factor 2 beyond the allowable interval.
I predict: this thing will have to go back to the assembly building. The repaired seals may, or may not, be the source of the continuing leaks. However, it is clearly something closely adjacent, in that same vicinity.
The 4% criterion they keep quoting is the lower flammability limit for hydrogen in air at 1 atm pressure.
GW
GW Johnson
McGregor, Texas
"There is nothing as expensive as a dead crew, especially one dead from a bad management decision"
Offline
Like button can go here
Details in the news stories are scarce. However, there seem to be 2 hydrogen fittings, the 8-inch one that they repaired, and another 4-inch one. They got the leaks down to an acceptable level, then had the leak with the 4-inch one. It wasn't enough to reach the 4% flammability limit, but one obscure story did say that this would have stopped a real countdown to launch.
So they still have hydrogen leak problems that threaten their launch countdown protocols, and there is the unverified battery charge issue for the flight termination system.
Even without a crew, this would be one expensive failure, if they make bad management decisions.
GW
GW Johnson
McGregor, Texas
"There is nothing as expensive as a dead crew, especially one dead from a bad management decision"
Offline
Like button can go here
Well, even Mother Nature is trying to give them a hint, with a hurricane headed for Florida. They got their waiver, but the timing would be wrong if they can't let the rocket ride out the hurricane on the pad. Current forecasts call for Cat 3 at landfall in Florida. The winds will very likely exceed the 74 knot max certified pad rideout speed.
GW
GW Johnson
McGregor, Texas
"There is nothing as expensive as a dead crew, especially one dead from a bad management decision"
Offline
Like button can go here
So far land fall of the hurricane is going to be on the opposite side of Florida in the pan handle shaped area of the state from the gulf side.
It would seem that the contractors have forgotten how to build rockets that are trouble free in the design.
Offline
Like button can go here
The most likely consensus predicted track is bit more west today than it was yesterday. The consensus seems to be a major storm at landfall in Florida. Could be a cat 3 or a cat 4, opinions and predictions vary. Bear in mind that a storm that intensifies to major status will be multiple hundreds of miles wide. Hurricane-force winds could easily extend a hundred miles or more from the center.
I think it very likely that the 74 knot windspeed limit for SLS sitting out in the open will be exceeded. Not a certainty, but a strong likelihood.
As for the current crew of rocket folk at NASA not being able to design it more trouble-free, well, you know what I say about that: 40% science, 50% art, 10% blind dumb luck (in production work, art and luck higher in development work). Nobody at NASA has done this in over 50 years. The folks who did this 50 years ago are long retired or long dead. The art was never passed on, because nobody was doing this kind of work during those 50 years.
I am very unsurprised to see some very stupid design mistakes surfacing. These are the ones never written down in what reports were written, about how to avoid stupid mistake problems. Manager hate to put anything but good PR into reports they have to sign off.
GW
GW Johnson
McGregor, Texas
"There is nothing as expensive as a dead crew, especially one dead from a bad management decision"
Offline
Like button can go here
I see they decided to roll it back into the VAB. Smart.
GW
GW Johnson
McGregor, Texas
"There is nothing as expensive as a dead crew, especially one dead from a bad management decision"
Offline
Like button can go here
For GW Johnson re #37
It's a chance to recharge the batteries without having to admit the error.
(th)
Offline
Like button can go here
Plus, it will get the protection from the building from flying scraps that might occur from other building damages.
Offline
Like button can go here
Looks like most of Florida is getting the crap beat and/or flooded out of it over the next few days. That would include the Cape Canaveral stuff.
Like I said, putting it into the VAB was smart. It was quite clear they did not want to do that, because they waited to the last possible hour to do it, but at least they did the right thing.
GW
GW Johnson
McGregor, Texas
"There is nothing as expensive as a dead crew, especially one dead from a bad management decision"
Offline
Like button can go here
GW,
Better late than never, right?
Offline
Like button can go here
There has been a fire indicated at the vertical bay it's in
Artemis I: A fire at NASA Kennedy gives the long-delayed Moon mission its latest twist
Offline
Like button can go here
Fire in a building full of several million pounds of solid propellant (class 1.3 explosive, by the way) is certainly something to be concerned about. Heat lights solid propellant. So do electric arcs (lightning).
Odd that the article had only 1 sentence revealing a fire occurrence. The rest of the article dealt with other things. Considering the impacts if one or both of those boosters had ignited or exploded in that building, I find that lack quite odd.
GW
GW Johnson
McGregor, Texas
"There is nothing as expensive as a dead crew, especially one dead from a bad management decision"
Offline
Like button can go here
https://news.yahoo.com/leaks-hurricanes … 49855.html
It appears that it was an electrical problem in the mobile platform on which the SLS rests generated a spark that ignited a rope, leading to an evacuation of the rocket hangar. They are still not sure what did it or if it will have any impact to getting the rocket to launch soon.
Offline
Like button can go here
Artemis 1 in November 2022 flys for 25 days an Uncrewed lunar orbit and return
NASA's Artemis 2 mission around Moon set for November 2024
https://phys.org/news/2023-03-nasa-arte … ember.html
Artemis-II will be manned
Last edited by Mars_B4_Moon (2023-03-08 15:46:33)
Offline
Like button can go here
other the missions in the future will be manned?
they say deliver of Lunar Gateway or simply Gateway will also be manned, launched on both Falcon Heavy and SLS. Into a Polar near-rectilinear halo orbit with an orbital period of 7 days.
Artemis 2 officially Artemis II
Four astronauts are to perform a flyby of the Moon and return to Earth,
Artemis 5 is said to involve a Blue Origin Blue Moon Lander and Astronauts Driving a Car on the Moon, a 30 day mission.
Artemis 8 would be living inside a Surface Habitat
https://web.archive.org/web/20230615105 … _rev_b.pdf
GAO report
they conclude "we found the lunar landing mission is unlikely to occur in 2025 as planned" due to ambitious schedule, delays to key events, large volume of remaining work, spacesuit design challenges
https://twitter.com/SpcPlcyOnline/statu … 7969775751
Last edited by Mars_B4_Moon (2023-12-04 05:43:17)
Offline
Like button can go here
Artemis/Orion atmosphere re-entry
Offline
Like button can go here
It's been almost a year since the last post about Artemis.
Artemis II is in preparation. I was curious to know where the heat shield is now, so I asked Google ...
Conversation with Gemini
Hello Again! Today I have what I hope is an easy request. I am working with a gent who would like to know where the Artemis II heat shield is now? It would be with the flight capsule to which it is bolted. The question is whether the system is still in the vendor facility, or if it has been moved to a NASA facility?
The Artemis II heat shield is currently located at the Neil Armstrong Operations and Checkout Building at NASA's Kennedy Space Center in Florida. It was installed on the Orion spacecraft on June 25, 2023.
Thanks! That's helpful!
You're welcome! Let me know if you have any other questions.
(th)
Offline
Like button can go here
GW Johnson has provided guidance recently, regarding Artemis Mission plans...
This post is a collection of snippets by Google, about Artemis planning....
Yes, according to current plans, SpaceX's Starship cannot reach the Moon with a full tank from launch, so it will need to be refueled in low Earth orbit (LEO) before continuing on to the Moon; this is a key part of the Artemis mission architecture where multiple Starship tankers will transfer fuel to a lunar lander in LEO before it travels to the Moon.
Key points about Starship and lunar missions:
Refueling necessity:
Due to its large size and payload capacity, Starship requires a significant amount of fuel to reach the Moon, making in-space refueling essential.Orbital depot:
SpaceX intends to establish a propellant depot in LEO where Starship tankers will deliver fuel to the lunar lander before its lunar journey.
Artemis missions:This refueling strategy is central to NASA's Artemis program, which aims to return humans to the Moon.
Artemis III and refuel in LEO - NASA Spaceflight Forum
Dec 15, 2023 — Artemis III and refuel in LEO * Artemis III and refuel in LEO by jfri on 15 Dec, 2023 14:56. * #1 by VSECOTSPE on 15 ...
NASA Spaceflight ForumNASA lays out how SpaceX will refuel Starships in low-Earth ...
Apr 30, 2024 — * rustybeancake. • • Top 1% Poster. Two reasons: Starship is big and heavy compared to Apollo, and can deliver much m...
Reddit ·
r/spacex
Starship Faces Performance Shortfall for Lunar Missions
Apr 20, 2024 — The success or failure of the Human Landing System program will be decided by Starship's payload capacity. Due to its ...Show all
Show more
A Starship HLS is supposed to rendezvous with an Orion capsule in lunar orbit, land on the lunar surface carrying those astronauts, and then return the astronauts to the Orion capsule in lunar orbit. It can also carry cargo directly from Earth to the lunar surface, after refueling in orbit.Jun 10, 2024
(th)
Offline
Like button can go here
This collection from Google is about Artemis scheduling:
NASA Shares Progress Toward Early Artemis Moon ...
NASA (.gov)
https://www.nasa.gov › news-release › nasa-shares-prog...
Jan 9, 2024 — NASA will now target September 2025 for Artemis II, the first crewed Artemis mission around the Moon, and September 2026 for Artemis III.Artemis II
Wikipedia
https://en.wikipedia.org › wiki › Artemis_II
The mission is scheduled for no earlier than September 2025. Four astronauts will perform a flyby of the Moon and return to Earth, becoming the first crew to ...
Artemis III · List of Artemis missions · Launch Complex 39B · Christina Koch
The September 2025 data may be optimistic, if the Crawler is not ready.