New Mars Forums

Official discussion forum of The Mars Society and MarsNews.com

You are not logged in.

Announcement

Announcement: As a reader of NewMars forum, we have opportunities for you to assist with technical discussions in several initiatives underway. NewMars needs volunteers with appropriate education, skills, talent, motivation and generosity of spirit as a highly valued member. Write to newmarsmember * gmail.com to tell us about your ability's to help contribute to NewMars and become a registered member.

#1 2021-11-20 12:18:07

SpaceNut
Administrator
From: New Hampshire
Registered: 2004-07-22
Posts: 28,747

NASA's Polar Resources Ice-Mining Experiment-1 (PRIME-1)

NASA picks landing site at the moon's south pole for ice-drilling robot

NASA has set its sights on the moon's south pole in its quest for ice.

This week, the space agency and the company Intuitive Machines announced Shackleton Crater landing site at the south pole of the moon for a small lander set to launch next year. The location is called the "Shackleton connecting ridge" and NASA data hint at ice lurking below the surface, the agency said in a statement on Nov. 3.

The robotic mission includes NASA's Polar Resources Ice-Mining Experiment-1 (PRIME-1) that requires solar power and a view of Earth for communications. The ridge zone should provide both, NASA said.

"Finding a landing location where we might discover ice within three feet of the surface was challenging," Jackie Quinn, PRIME-1 project manager at NASA's Kennedy Space Center in Florida, said in the statement.

"While there is plenty of sunlight to power the payloads, the surface gets too warm to sustain ice within reach of the PRIME-1 drill. We needed to find a 'goldilocks' site that gets just enough sunlight to meet mission requirements, while also being a safe place to land with good Earth communications."

NASA frames the PRIME-1 mission as a key step in learning how to mine resources from the lunar surface. The agency plans to land a series of longer human missions on the moon, known as Artemis, later in the 2020s. But to make such an effort sustainable, NASA argues, scientists and engineers need to practice in-situ resource utilization (ISRU), which is the practice of using resources in the local environment.

PRIME-1 aims to deploy a drill, called The Regolith Ice Drill for Exploring New Terrain (TRIDENT), which will attempt to burrow as deep as 3 feet (almost 1 meter) underneath the surface. The experiment also hosts a mass spectrometer that will measure gases TRIDENT may uncover from volatiles, which are elements and compounds that easily transform from gas to liquid to solid.

NASA plans to use the "lessons learned" from PRIME-1 to prepare for a more ambitious lunar rover mission, the Volatiles Investigating Polar Exploration Rover (VIPER), which will also land at the south pole in 2023. In September, the agency announced VIPER's landing site would be just west of Nobile, a crater near the moon's south pole.

The Intuitive Machines lander, known as Nova-C, will host other technology demonstration experiments. For example, Nokia will test a "space-hardened" 4G and LTE network to attempt high-speed networking on the surface, while an Intuitive Machines rover-hopper called Micro-Nova will try to pick up pictures and science data inside a nearby crater.

Intuitive Machines, along with Astrobotic and Orbit Beyond, were selected in May 2019 for NASA's Commercial Lunar Payload Services (CLPS) initiative. CLPS aims to test science experiments and technology demonstrations on the moon through private companies. Selection for CLPS places companies in a pool of qualified applicants, from which NASA may draw for future missions.

NASA next announced in October 2020 that it would pay Intuitive Machines up to $47 million to deliver PRIME-1 to the surface, and then in August this year, Intuitive Machines said it would task a SpaceX Falcon 9 rocket with launching the lander to space and aiming it towards the moon.

Offline

#2 2021-11-20 12:22:12

SpaceNut
Administrator
From: New Hampshire
Registered: 2004-07-22
Posts: 28,747

Re: NASA's Polar Resources Ice-Mining Experiment-1 (PRIME-1)

https://www.nasa.gov/directorates/space … s/PRIME-1/

We know that water is the key to being able to stay on the moon and the craters seem to be where we might find enough.

The PRIME-1 augering drill is approximately 3.2 feet (1 meter) long.

Offline

#3 2023-03-31 11:27:18

Mars_B4_Moon
Member
Registered: 2006-03-23
Posts: 8,892

Re: NASA's Polar Resources Ice-Mining Experiment-1 (PRIME-1)

Nokia to set up first 4G network on moon with NASA

https://www.cbsnews.com/news/nokia-moon-nasa-4g/

Offline

Board footer

Powered by FluxBB