Page 12 of 14
Re: Images for FluxBB: extendedMerlin2kgs-at2Seconds-1-3
Posted: Mon Jan 12, 2026 9:53 pm
by tahanson43206

- massFlows_phiSum.png (29.73 KiB) Viewed 8140 times

- deltaT.png (33.74 KiB) Viewed 8140 times

- Courant_max.png (30.78 KiB) Viewed 8140 times
Re: Images for FluxBB: extendedMerlin-2kgs-4-6
Posted: Mon Jan 12, 2026 9:55 pm
by tahanson43206

- T_avg.png (35.18 KiB) Viewed 8140 times

- rho_mass.png (34.25 KiB) Viewed 8140 times

- p_avg.png (46.04 KiB) Viewed 8140 times
Re: Images for FluxBB: extendedMerlin-2kgs-7-8
Posted: Mon Jan 12, 2026 9:55 pm
by tahanson43206

- T_min_global.png (45.98 KiB) Viewed 8140 times

- T_max_global.png (34.93 KiB) Viewed 8140 times
Re: Images for FluxBB: 2 kg/s run with washer got pulses
Posted: Wed Jan 14, 2026 2:47 pm
by tahanson43206
Re: Images for FluxBB: 2 kg/s run with washer 40 MW
Posted: Wed Jan 14, 2026 4:08 pm
by tahanson43206

- T_avg.png (38.51 KiB) Viewed 8135 times

- T_max_global.png (59.46 KiB) Viewed 8135 times

- T_min_global.png (37.29 KiB) Viewed 8135 times
Re: Images for FluxBB: 2 kg/s run to 4 seconds
Posted: Wed Jan 14, 2026 4:13 pm
by tahanson43206

- time intervals decreasing as work increases
- deltaT.png (38.16 KiB) Viewed 8135 times

- Equations working at maximum set by run parameter of 7
- Courant_max.png (28.26 KiB) Viewed 8135 times
Re: Images for FluxBB: Plots extendedMerlin to 8 seconds
Posted: Sat Jan 17, 2026 8:49 pm
by tahanson43206
Re: Images for FluxBB: 2 kg/s run 0 - 8 seconds Washer
Posted: Sun Jan 18, 2026 12:35 am
by tahanson43206

- T_avg.png (36.5 KiB) Viewed 8110 times

- T_max_global.png (77.64 KiB) Viewed 8110 times

- T_min_global.png (32.38 KiB) Viewed 8110 times
Re: Images for FluxBB: 2 kg/s 0 to 8 seconds
Posted: Sun Jan 18, 2026 12:37 am
by tahanson43206

- deltaT.png (43.17 KiB) Viewed 8110 times

- Courant_max.png (28.14 KiB) Viewed 8110 times
Re: Images for FluxBB:NewNozzle at 4 seconds
Posted: Mon Jan 19, 2026 8:26 pm
by tahanson43206
This post shows a plot of thrust for a model based upon extendedMerlin but omitting the Merlin engine.
This model consists of a 240 meter heat pipe and a 5 meter stub which is not heated.
The model is preloaded with hydrogen at 21 Kelvin. When a run begins at zero, 40 MW of volume heating is applied immediately.
Meanwhile, the intake flow ramps from zero to 2 kg/s of hydrogen at 20 Kelvin, and the exit port is opened to near vacuum (20000 Pascal)
During the first four seconds of operation. the initial load proceeds toward the exit.

- NewNozzle pipe only 0 to 4 seconds
- thrust_over_time.png (35.59 KiB) Viewed 8065 times